To clear Rebuilding: North Phase 2 in Arknights: Endfield, set up an automated production line producing at least 90 Cuprium ingots per minute and route the output directly into your regional northern collection depot. You can assemble this facility manually or import pre-configured layout codes into your Automated Industry Complex (AIC) terminal to align smelters, splitters, and power connections instantly.

Blueprint Codes and Import Prerequisites

Before deploying factory blueprints in the northern Exclusion Zone, advance the Rebuilding a Home event chain until Phase 2 unlocks on your terminal. This opens the northern AIC construction grid.

Prior to pasting a schematic, clear all hostile enemies and dismantle leftover scrap structures from the build site. Uneven terrain obstructions and scrap rubble cause bounding box collisions that invalidate blueprint placement.

Shared community blueprint strings for the Asia server include:

  • Phase 2 Master Layout: EFO01u8U47U7560UiAEOU
  • New 90/m Cuprium Line: EFO01521e6167ouO3e7oe

Note: Blueprint codes are server-specific and tied to format versions (such as Exclusion Zone 1.7). They are not guaranteed to remain active across different regional servers or future game updates.

When importing a blueprint code, the AIC queries your inventory and linked storage for the required structures. Ensure you have the necessary machinery stockpiled before confirming placement:

  • Mining rigs (drills)
  • Electric smelters
  • Conveyor belts
  • Logistics splitters and mergers
  • Power relay pylons

If your inventory lacks the required components, the system pastes an incomplete outline, requiring you to craft and insert missing parts manually.

90/m Cuprium Architecture and Component Ratios

Reaching and sustaining a steady 90 Cuprium per minute quota requires balancing raw extraction with smelting capacity so furnaces never starve or choke.

Facility ComponentTarget Rate / RatioOperational FunctionFailure Point
Cuprium Mining Rigs90+ Raw Ore / minExtracts raw ore from northern nodesUnder-producing nodes starve smelters
Electric SmeltersBalanced Smelter ArrayRefines raw ore into Cuprium ingotsPower brownout halts processing
Splitters & Mergers1-to-2 / 1-to-3 ManifoldDistributes ore evenly to all furnacesLow-tier belts bottleneck combined flow
Logistics Belts90 Refined Output / minRoutes finished ingots to depot intakeInverted belt direction traps output

To maintain maximum throughput:

  1. Extract Ore: Place mining rigs across available Cuprium nodes to reach a baseline feed of at least 90 raw ore per minute.
  2. Split the Feed: Route raw ore through balanced splitter manifolds rather than long, unbuffered daisy chains so every furnace receives ore simultaneously upon startup.
  3. Merge Ingot Output: Direct smelter output lines through mergers into a single primary trunk belt rated to transport at least 90 items per minute.
  4. Buffer the Depot Line: Place an intermediate storage container between the final smelter merger and the collection depot intake to absorb brief delivery pauses without backing up the furnaces.

Power Network Alignment

A 90/m smelting setup creates a dense electrical load within a localized grid.

  • Surplus Margin: Maintain a 15% to 20% surplus power buffer above peak factory consumption. If total demand exceeds grid capacity, mining extractors slow down or shut off, triggering cascading ore shortages.
  • Pylon Placement: Run power relay pylons along the perimeter of the factory footprint rather than through the center of assembly rows. This prevents structural collisions and maintains line-of-sight connections across uneven northern terrain.

Troubleshooting Factory Failures

If your blueprint fails to paste or production falls below 90 items per minute, check the following points:

  • Placement Blocked (Red Bounding Box): Confirm you are standing outside the schematic boundary. Remove lingering mineral deposits, monster drops, or scrap debris within the grid.
  • Smelters Idle Despite Power: Interact with unconfigured smelters to confirm the Cuprium Ingot recipe is selected.
  • Ore Backing Up at Miners: Inspect conveyor junctions immediately outside the mining rig ports to ensure belt directions were not reversed during blueprint placement.
  • Event Quotas Not Advancing: Verify that finished ingots are entering the regional event collection depot or designated shipping container rather than diverting into local crafting storage. Keep secondary lines, such as Ex Cuprium branches, isolated until the core Phase 2 requirement is satisfied.
Arknights: Endfield icon

Free Arknights: Endfield Codes

Current active codes and how to redeem them.

View Codes
Sarah Williams

Sarah Williams

Sarah specializes in RPG and collection games, explaining team building, character growth, and beginner-friendly ways to avoid expensive early mistakes.