To complete the Phase 1 Rebuild Restricted Zone milestones and their prerequisite tasks in Arknights: Endfield Version 1.7, confine your automated production blueprints entirely to the Old Dam industrial area. Restricting your early processing lines to this single zone prevents cross-map logistics entanglements, protects your Automated Industry Complex (AIC) territory budget, and provides stable throughput before you expand into Phase 2 infrastructure.

Setting Up in the Old Dam Industrial Area

The Old Dam industrial area offers an enclosed, flat building perimeter with enough space to handle all Phase 1 refining and fabrication demands. Placing infrastructure across multiple zones early in the game causes significant logistical friction:

  • Logistics conservation: Long conveyor runs across uneven ground expose lines to elevation snags and map obstacles. Keeping lines in the Old Dam ensures full intake-to-collection visibility within one camera view.
  • Territory budget management: Concentrated footprints preserve AIC bandwidth for future outpost links.
  • Safe maintenance: Confining machinery to the industrial boundary avoids routing fragile transport belts through high-level enemy patrol paths.

Clearing Prerequisite Tasks Before Main Phase 1 Assembly

Complete the intermediate prerequisite turn-in quotas before locking in your permanent Phase 1 heavy assembly rows. Prerequisite tasks require baseline volumes of refined components to authorize main construction access. Setting up a dedicated, temporary layout prevents these early quotas from clogging your long-term production lines.

Production ElementOperational RoleRecommended Placement
Intake SortersFilter raw ore directly from arrival feedsOld Dam perimeter entry point
Primary SmeltersRefine incoming ore into standardized ingotsParallel rows directly behind intake sorters
Component FabricatorsAssemble ingots into required prerequisite itemsCentral lanes adjacent to power relays
Buffer SilosHold surplus intermediate items to prevent line jamsBeside output docks before export terminals

Once the prerequisite tasks register as complete, rewire or decommission the component fabricators directly into the primary Phase 1 delivery hopper. This transition retains your basic power network and ore intake trunks without requiring a full rebuild from scratch.

Optimizing Phase 1 Belt Flow and Production Lines

Maintain direct, unbranched conveyor runs between refining machines and assemblers to prevent component starvation. Overusing splitters to power too many assemblers simultaneously drops supply rates below operating capacity, causing fabricators to stall.

  1. Arrange machines in parallel rows: Place smelters in a primary intake line and align fabricators parallel to them to minimize belt transit time.
  2. Use balanced inline splitters: Tune 1-to-2 splitters strictly to match downstream machine consumption rates so that no assembler sits idle.
  3. Stack vertical belt tiers: If recipes require multiple component inputs, feed them through stacked belt levels rather than crossing tracks along the floor. This layout prevents collision issues and makes blocked belts easy to spot.

Grid Distribution and Perimeter Power Routing

Place power relay pylons exclusively along the outer structural boundaries of the Old Dam zone. Dropping electrical poles directly between machine rows creates invalid placement zones for conveyor belts and sorters. Running high-voltage relays along perimeter corners provides full electrical coverage across the interior floor while leaving the building grid unobstructed.

Check your continuous power generation surplus before activating all Phase 1 lines simultaneously. Operating at peak capacity without adequate surplus risks cascade power failures, where stalled smelters rapidly starve downstream fabricators.

Common Pitfalls and Preparing for Phase 2

Prevent progression bottlenecks as you approach Phase 2 milestones by maintaining a lean base footprint:

  • Cap storage buffers: Store only the components required to clear active Phase 1 quotas. Storing excess low-tier goods locks up raw ore needed for higher-tier Phase 2 recipes.
  • Clear transport corridors: Leave a two-tile clearance lane pointing toward the project delivery terminal so future export conveyors can connect without altering active production banks.
  • Match machine processing speeds: Avoid feeding high-speed smelter outputs into low-tier fabricators without calculated overflow valves, which create backlogs.
  • Preserve raw feed trunks: Keep raw ingot output lines accessible so they can tie directly into Phase 2 blueprints as soon as the next reconstruction tier unlocks.
Arknights: Endfield icon

Free Arknights: Endfield Codes

Current active codes and how to redeem them.

View Codes
Michael Smith

Michael Smith

Michael covers live-service games, events, reward systems, and efficient daily routines, turning frequent updates into clear actions for players.